Logistics Centre

Building:

Office building for headquarters staff and the General Storage Warehouse of approximately 40,000 m2. It is used for the storage of loan and repair pool equipment, cargo consolidation and other support to operations, along with a workshop for the maintenance of vehicles and other equipment.

Brief:

The brief for CP Australia was to keep it simple as possible for the end user to maintain at the completion of the liabilities period and provide a reliable control solution.

Solution:

Warehouse areas were controlled by the EBDHS-PRM High Bay Detector in overlapping zones and racking areas used the masking shields for more accurately control. All office lighting was a combination of OEM product supplied to two lighting manufacturers and standalone detectors. Hazardous locations called for the Rapid control system so that only 12v was out in the hazardous zone.

Fact:

The project involved 8 buildings in total, warehousing for various materials, hazardous goods warehousing and office building all within the one site.