EBR-CFE-PC Control and monitoring, PC and software

The RAPID graphical interface is designed to provide the user flexible control and monitoring of the lighting from a PC.

Bitmaps of the building floors can be illustrated for all control devices, which are graphically depicted as icons on the floor layout or in a drop down window within Microsoft Windows. The graphical interface gives the user the ability to re-configure control devices or monitor their status, changing of lighting groups can be achieved quickly and simply thus negating the need for physical changes within the ceiling void.

Time settings for presence detectors, corridor and group hold delays can be adjusted to the client's requirements. An event calendar provides the client with the ability to schedule lighting control events for special occasions, cleaning, re-lamping and emergency testing of lights. Lamp error feedback is reported for any luminaire which is controlled by a DALI ballast.

Part codes:
CODE DESCRIPTION
EBR-CFE-PC Control and monitoring, PC and software
Energy Efficiency in Buildings

This product forms part of a wide range of devices to enable Energy Efficiency in Buildings – A structured and holistic approach to reducing the carbon footprint and increasing sustainability of businesses.

Find out more

legrand