Latest Projects

Project: Swindon Academy

Building: Lecture theatre located within the main academy buildings.

Brief: To supply a system which will cater for the varied lighting conditions a lecture theatre presents.

Solution: All Vitesse Plus, Rapid scene setting with standlone PIRs and microwaves were implemented.

Fact: Vitesse Modular™ plug in presence detectors, control devices and its modular construction make it a very simple system to install; and the reduced number of parts means that the stockholding of product is greatly reduced for the installer and wholesaler alike.

Swindon Academy

Share this page